Cometa - energy
Trenching at the record water depth of 1,030 meters.
Project description:
- Securing a high-voltage submarine link between the Spanish mainland and Mallorca.
Project challenges:
- The seabed between the two connections reaches a depth of 1,500 meters, and protection was required down to 1,000 meters, which was a new challenge for the Capjet ®.
![]() |
Nexans' solution:
|