Njord – oil & gas
Extra protection with specially designed backfill plough
Project description:
- Extra protection with specially designed backfill plough.
Project challenges:
- Protection of a 10" steel pipeline
- A backfill of one meter was required, in the clayish seabed, to provide weight to prevent upheaval buckling.
![]() |
Nexans' solution:
|